Work Crew Gather         
The two work crews gather to work on the weld. They had been in location all day the previous day, but the dispatcher would not give them a clean window to work with, so the foreman placed a 10mph speed restriction on the track. Getting work time after the speed reduction was fairly easy.
Date: 12/11/2012 Location: Galt, CA   Map Show Galt on a rail map Views: 183 Collection Of:   Frederick S. Goethel
Rolling Stock: UP 65335 (MofW Equipment) UP 64891 (MofW Equipment) Author:  Frederick S. Goethel
Work Crew Gather
Picture Categories: Track This picture is part of album:  Repairing a Broken Weld
Share
User Comments
Name Type Comments Date
Fred Stuckmann General Yup, that usually does the trick, nice shots. 8/9/2013 2:43:30 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3589621