One worker lifts the track with a pry bar to allow the other worker to completly cut through the track on the second cut. Not the new piece of track hanging from the crane waiting to be installed. |
Date:
12/11/2012 |
Location:
Galt, CA Map |
Views:
97 |
Collection Of:
Frederick S. Goethel |
|
Author: Frederick S. Goethel
|
|
Picture Categories: Track |
This picture is part of album: Repairing a Broken Weld |